Oliveira, M. M.; Zózimo, A. C.; Sfetsos T.; Galanopoulou M. I.; Papadopoulos, T.; Tombul, E.; Ozdemir, A.; Temiz, N.; Perdigão, R.; HALL J.; JAUMOUILLE, A.; FREISSINET C.; Ribas M. M.; Estrany J.; Iskandar, R.; Rahman, M.; Pranto, S. I.; Martins, T.; Bakogianni, E.; Brandão de Vasconcelos, A; Pinheiro, L.; Capitão, R.; Fortes, C. J. E. M.; Leitão, T. E.; Senturk, M.; Fernandes, J. N.; Craveiro, J.; CRUZ, M.M.; VENTURA, S.; Ribas M. M.
(2025-09-30)
This deliverable – D6.3 – is part of the Work Package 6 (WP6): “Implementation and validation at CSA” led by the National Laboratory for Civil Engineering (LNEC).
The objectives of WP6 are to ensure smooth operation and ...