Oliveira Santos, L.; Xu, Min; Santos, J.
(IABSE - International Association for Bridges and Structural Engineering, 2016-09)
The new railway crossing over the River Sado is a 2,7 km long bridge, including two approach viaducts and a main bridge. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a ...