Berberan, A. L.; Machado, M.; Batista, S.
(Survey Review, 2007-07)
A tunnel has been under construction for the Lisbon Metro network on the muddy bed of river Tagus. An
incident during the jet-grouting for the muddy soil treatment led to flooding of a specific sector of the
tunnel and ...