DSpace Repository

DHA/NES - Relatórios Científicos

DHA/NES - Relatórios Científicos

 

Recent Submissions

  • Rosa, M. J.; Campinas, M.; Silva, C. (2025-08)
    The LIFE Fitting project (2023-2025) involved 3 partners (LNEC, TRATAVE, SA, Universidade Católica do Porto) and successfully achived its two main objectives: (i) to soundly evaluate, at full scale, operational strategies ...
  • Obinna, U.; Silva, C.; Rosa, M. J. (2025-05)
    This document is a strategic manual produced within the Water4All Partnership, specifically for Pillar D Demonstration activities, task D2.6 – Replication of Methodologies. The core purpose of this task is to create ...
  • Rosa, M. J.; Silva, C.; Cardoso, M. A. (2025-05)
    Water-Oriented Living Labs (WOLLs) are one of the main environments boosting innovations in the water sector and supporting the transition to a water-smart society. The current document is the roadmap for creating and ...
  • Silva, C.; Rosa, M. J.; Manaia, C; Costa, C. (2025-06)
    This document is a deliverable of Task 7.2 “Exploitation plan including replication component (during and After-LIFE)” and presents the exploitation and the replication strategies and activities designed to maximize the ...
  • Rosa, M. J.; Campinas, M.; Silva, C. (2025-06)
    LIFE Fitting has evaluated, at full scale, operational strategies to enhance the removal of micropollutants and other chemical contaminants of emerging concern (CECs, mostly pharmaceutically active compounds) as well as ...
  • Silva, C.; Viegas, R.M. C.; Campinas, M.; Rosa, M. J. (2025-06)
    This document is a deliverable of the tasks T.5.2 “Forecast WWTPs’ performance towards CECs with CEC ForecasTool”, T.5.3 “Simplified monitoring protocols with MonitorTool”, T.5.4. “Smart discharge-driven WWTP operation ...
  • Silva, C.; Viegas, R.M. C.; Rosa, M. J.; Faria, G.; Costa, C. (2025-06)
    This documet is a deliverable of Task 7.1 "Life Cycle Assessment of smart-discharge-driven operation of urban WWTPs towards regular and emerging contaminants", and presents the Cycle Assessement (LCA) for assessing the ...
  • Rosa, M. J.; Campinas, M.; Silva, C.; Manaia, C; Costa, C. (2025-08)
    This policy brief offers key messages and recommendations to address the implementation of the new Urban Wastewater Directive (UWWTD) on microplollutants and antimicrobial resistance (AMR) and to pave the way into a ...
  • Rosa, M. J.; Ribeiro, R.; Viegas, R.M. C.; Oliveira, M. M.; Teixeira, P.; Figueiredo, D.; Lourinho, R,; Mendes, R.; Fernandes, J.; Alpalhão, J.; Coelho, S.T.; Vitorino, D.; Andrade, D. (2024-08)
    This document summarises the work carried out by the Lisbon Living Lab within the B-WaterSmart WP2 – Water-smart technologies and concepts. It is the final deliverable of task 2.4 - Lisbon LL solutions, which was closely ...
  • Mestre, A.S.; Mesquita, E.; Andrade, M. A.; Viegas, R.M. C.; Rosa, M. J.; Carvalho, A. P. (2025-01)
    This document reports the activity developed in FCT EMPOWER+ project (2021-2024) in which new high-performing granular activated carbons (GACs), powdered activated carbons (PACs) and reusable magnetic PACs (MPACs) prepared ...
  • Casals, I.; Santos, E.; Canellas, J.; Cauwenberg, P.; Vervaeren, H.; Raes, S.; Glotzbach, R.; Collette, R.A.; Nocker, A.; Zimmermann, B.; Lutze, R.; Figueiredo, D.; Lourinho, R,; Viegas, R.M. C.; Rosa, M. J.; Chiucchini, N.; Ragazzo, P.; Gatto, O.; Ugarelli, R.; Gratl, F.; Muthanna, T.M. (2024-08)
    This deliverable is a synthesis report on the results of all the technologies in the different case studies within the B-Watersmart project. As the final report on the outcome of the technology demonstrations, it provides ...
  • Gomes, C.; Melo, M.; Damman, S.; Rebelo, M.; Glotzbach, R.; Kruse, J.; Wencki, K.; Oberdörffer, J.; Quina, A.; Rosell, L. F.; Rosa, M. J.; Teixeira, P.; Ragazzo, P.; Chiucchini, N. (2024-08)
    This report of Work Package 5 – Society, Governance, Policy corresponds to D5.7 – “Final report on social acceptance and behaviours towards water-smart solutions” (M48). It is the final output from Task 5.3 - Assessment ...
  • Conrad, A.; Müller, A.; Das, B.; Schieren, J.; Lukas, B.; Brauner, R.; Cardoso, M. A.; Rosa, M. J. (2024-12)
    D5.8 Set of Policy Briefs on Regulation and Policy Instruments outlines comprehensive guidelines and strategic recommendations to enhance the governance and regulatory frameworks for watersmart systems across Europe. This ...
  • Cardoso, M. A.; Silva, C.; Alegre, H.; Rosa, M. J.; Casals, I.; Santos, E.; Collette, R.A.; Oberdörffer, J.; Hesse, K; Wencki, K.; Neo, F.; Teixeira, P.; Perdigão, M.; Chiucchini, N.; Ragazzo, P. (2024-12)
    The Innovation Alliance (InAll) of the B-WaterSmart (BWS) project was established across the project's six Living Labs (LLs): Alicante, Bodø, Flanders, Lisbon, East Frisia, and Venice. InAll constitutes a key co-production ...
  • Kruse, J.; Wencki, K.; Glotzbach, R.; Santos, E.; Casals, I.; Poveda, A.; Collette, R.A.; Oberdörffer, J.; Hesse, K; Freitas, C.; Teixeira, P.; Néo, F.; Rosa, M. J.; Ribeiro, R.; Silva, C.; Ragazzo, P.; Chiucchini, N.; Ugarelli, R.; Paepe, S.; Van Bauwel, F.; Joris, I.; Nies, J.; Cauwenberg, P.; Vervaeren, H.; Raes, S.; Ruelens, A. (2024-08)
    This report contains the Living Lab final Strategic Agendas as agreed with stakeholders in the Communities of Practice and a description of their development process. Within the final Strategic Agendas, some main achievements ...
  • de la Cruz, A.; Villanueva, A.; Evans, B.; Brito, R.; Bügelmayer-Blaschek, M.; Havlik, D; Quartero, A.; Sfetsos, A. (2024-06)
    This document is the third version of the Implementation Plan and Risk Contingency Plan. First, it indicates how the work of the project has been divided and organized as well as the way to evaluate if the project objectives ...
  • Brito, R.; Cardoso, M. A.; Sfetsos, A.; Mendes, A.; Matos, R. S.; Oliveira, A. (2024-02)
    This deliverable focuses on the purpose, scope, and assumptions of the resilience assessment method. It presents the structure of the method and of the frameworks. Two frameworks are provided, the ICARIA RAF (Resilience ...
  • Almeida, M. C.; Rebelo, M.; Gervasio, I. (2024-10)
    The Technical Guide presents the 4th generation of the service quality assessment system, which abandons some 3rd generation indicators and adds new ones to respond to the latest challenges to supply services, urban waste ...
  • Cardoso, M. A.; Silva, C.; Rosa, M. J.; Alegre, H.; Casals, I.; Santos, E.; Collette, R.A.; Oberdörffer, J.; Hesse, K; Wencki, K.; Neo, F.; Teixeira, P.; Perdigão, M.; Chiucchini, N.; Ragazzo, P. (2024-06)
    This milestone aims at providing the lessons learnt from joint application of water-smartness dashboard for long-term strategic planning in the LLs, within the Innovation Alliance (InAll, Task 1.4). InAll provides a means ...
  • Silva, C.; Rosa, M. J. (2024-03)
    The LIFE Fitting deliverable “Extract of the project data from the LIFE KPI webtool (M9) include the KPIs calculation within the first 9 months to monitor and evaluate the project impact and report in the LIFE KPI web tool. ...

View more