DSpace Repository

First infilling of the underground structures of the Gouvães hydroeletric scheme - Monitoring and observed behaviour

Show simple item record

dc.contributor.author Pereira, R. pt_BR
dc.contributor.author Muralha, J. pt_BR
dc.contributor.author Lamas, L. pt_BR
dc.contributor.editor Carlos Pina pt_BR
dc.contributor.editor Eliane Portela pt_BR
dc.contributor.editor Laura Caldeira pt_BR
dc.date.accessioned 2025-12-19T14:01:54Z pt_BR
dc.date.accessioned 2026-05-05T15:10:38Z
dc.date.available 2025-12-19T14:01:54Z pt_BR
dc.date.available 2026-05-05T15:10:38Z
dc.date.issued 2025-04 pt_BR
dc.identifier.uri http://dspace2.lnec.pt:8080/jspui/handle/123456789/1019107 pt_BR
dc.identifier.uri http://repositorio.lnec.pt:8080/jspui/handle/123456789/1019107
dc.description.abstract The Gouvães pump-storage hydroelectric scheme includes a 7800m-long underground power conduit connecting the Gouvães and the Daivões reservoirs, with a hydraulic head of 657 m and a 49 m-high underground powerhouse located at the depth of 300 m. To monitor the behaviour of the main caverns during the construction stages, a monitoring plan was developed and implemented. For the first infilling of the power conduit, a detailed plan was prepared, and the monitoring plan was upgraded to account for the hydraulic actions and the water flow in the rock mass. This paper describes the main structures of this scheme, presents the main geological and geotechnical information and introduces the main aspects of the monitoring system used for the construction stage of the underground structures. The paper outlines and justifies the proposed sequence and schedule for the first infilling phase, as well as the upgrades made to the monitoring system for this stage. It examines the observed behaviour during infilling, such as flow rates and water pressures, and how these factors influenced adjustments to the original infilling plan. Finally, it reviews the condition of the underground structures at the start of their service life. pt_BR
dc.language.iso por pt_BR
dc.publisher Laboratório Nacional de Engenharia Civil pt_BR
dc.rights openAccess pt_BR
dc.subject Gouvães hydroeletric scheme pt_BR
dc.subject Undergournd structures pt_BR
dc.subject Monitoring pt_BR
dc.subject Construction pt_BR
dc.subject First infilling pt_BR
dc.title First infilling of the underground structures of the Gouvães hydroeletric scheme - Monitoring and observed behaviour pt_BR
dc.type conferenceObject pt_BR
dc.identifier.localedicao Lisboa, Portugal pt_BR
dc.identifier.local Lisboa, Portugal pt_BR
dc.description.sector DBB/NMMR pt_BR
dc.identifier.conftitle 5th International DAM WORLD Conference pt_BR
dc.contributor.peer-reviewed SIM pt_BR
dc.contributor.academicresearchers NAO pt_BR
dc.contributor.arquivo NAO pt_BR


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account