| dc.contributor.author | Silva, C.
|
pt_BR |
| dc.contributor.author | Viegas, R.M. C.
|
pt_BR |
| dc.contributor.author | Campinas, M.
|
pt_BR |
| dc.contributor.author | Rosa, M. J.
|
pt_BR |
| dc.date.accessioned | 2025-10-06T08:49:38Z | pt_BR |
| dc.date.accessioned | 2025-11-27T12:23:05Z | |
| dc.date.available | 2025-10-06T08:49:38Z | pt_BR |
| dc.date.available | 2025-11-27T12:23:05Z | |
| dc.date.issued | 2025-06 | pt_BR |
| dc.identifier.uri | http://dspace2.lnec.pt:8080/jspui/handle/123456789/1018832 | pt_BR |
| dc.identifier.uri | http://repositorio.lnec.pt:8080/jspui/handle/123456789/1018832 | |
| dc.description.abstract | This document is a deliverable of the tasks T.5.2 “Forecast WWTPs’ performance towards CECs with CEC ForecasTool”, T.5.3 “Simplified monitoring protocols with MonitorTool”, T.5.4. “Smart discharge-driven WWTP operation with Smart Discharge Tool” and T.5.5 “Strategic planning with PlanTool” and presents the PLAN-DO toolbox description and instructions on how to use it. The PLAN-DO toolbox aims at enabling a smart-discharge-driven operation, monitoring and strategic planning of WWTPs. | pt_BR |
| dc.language.iso | eng | pt_BR |
| dc.rights | openAccess | pt_BR |
| dc.subject | Plan-do toolbox | pt_BR |
| dc.subject | Life fitting | pt_BR |
| dc.subject | Activated sludge | pt_BR |
| dc.title | PLAN-DO Toolbox | pt_BR |
| dc.title.alternative | LIFE Fitting D5.1 | pt_BR |
| dc.type | report | pt_BR |
| dc.description.sector | DHA/NES | pt_BR |
| dc.contributor.arquivo | SIM | pt_BR |