Abstract:
This document is a deliverable of the tasks T.5.2 “Forecast WWTPs’ performance towards CECs with CEC ForecasTool”, T.5.3 “Simplified monitoring protocols with MonitorTool”, T.5.4. “Smart discharge-driven WWTP operation with Smart Discharge Tool” and T.5.5 “Strategic planning with PlanTool” and presents the PLAN-DO toolbox description and instructions on how to use it. The PLAN-DO toolbox aims at enabling a smart-discharge-driven operation, monitoring and strategic planning of WWTPs.