DSpace Repository

Construction of the Southern Expansion of the Cerro do Lobo Waste Facility

Show simple item record

dc.contributor.author Manso, J. pt_BR
dc.contributor.author Brito, A. pt_BR
dc.contributor.author Barroso, M. P. pt_BR
dc.contributor.author Marcelino, J. pt_BR
dc.contributor.author Galrão, R. pt_BR
dc.contributor.author Oliveira, M. pt_BR
dc.contributor.editor Carlos Pina pt_BR
dc.contributor.editor Eliane Portela pt_BR
dc.contributor.editor Laura Caldeira pt_BR
dc.date.accessioned 2025-09-26T14:24:44Z pt_BR
dc.date.accessioned 2025-11-27T12:21:57Z
dc.date.available 2025-09-26T14:24:44Z pt_BR
dc.date.available 2025-11-27T12:21:57Z
dc.date.issued 2025-04-16 pt_BR
dc.identifier.uri http://dspace2.lnec.pt:8080/jspui/handle/123456789/1018820 pt_BR
dc.identifier.uri http://repositorio.lnec.pt:8080/jspui/handle/123456789/1018820
dc.description.abstract Neves-Corvo is a copper-zinc mine producing copper, zinc and lead concentrates. The mine is owned and operated by Lundin Mining's Portuguese subsidiary SOMINCOR. Lundin Mining acquired Neves-Corvo through the merger with EuroZinc Mining in 2006. It is located in the Alentejo district of southern Portugal. The ore is processed on site and the tailings are deposited at the Cerro do Lobo Waste Facility. During the operational phase, the mining waste will be deposited vertically, in stages, from the current five levels to thirteen levels (with an average slope of 5 %). In order to accommodate this process, it has been necessary to expand this infrastructure, including the southern expansion of the tailings dam. The dam will contain waste up to level 8 (at an elevation of 272 m), with a maximum height of 17 m, and walls with slopes of 1(V):2.5(H) upstream, allowing the use of geosynthetics, and 1(V):2(H) downstream. Apart from of the left abutment, the dam’s foundation was constructed on the natural terrain. The dam’s lining system consists of a transition layer, composed of a sandy material, a geosynthetic clay liner and a high-density polyethylene (HDPE) geomembrane. This paper provides a detailed description of the methodology employed in the dam’s construction, with particular emphasis on the use of soil-rockfill mixtures as the primary building material. It also outlines the specific techniques employed to ensure the quality and durability of the construction. pt_BR
dc.language.iso eng pt_BR
dc.publisher LNEC pt_BR
dc.rights openAccess pt_BR
dc.subject Tailings dam pt_BR
dc.subject monitoring system pt_BR
dc.subject lining system pt_BR
dc.subject geosynthetics pt_BR
dc.subject soil-rockfill mixtures pt_BR
dc.title Construction of the Southern Expansion of the Cerro do Lobo Waste Facility pt_BR
dc.type other pt_BR
dc.identifier.localedicao LNEC pt_BR
dc.description.pages 2249-2259 pt_BR
dc.identifier.local LNEC pt_BR
dc.description.volume Volume 2 pt_BR
dc.description.sector DG/NGOH pt_BR
dc.description.magazine Dam World 2025 - proceedings pt_BR
dc.identifier.conftitle Dam World 2025 pt_BR
dc.contributor.peer-reviewed SIM pt_BR
dc.contributor.academicresearchers NAO pt_BR
dc.contributor.arquivo SIM pt_BR


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account