LNEC support to the design adaptation of Alto Tâmega dam due to the rockslide on the right bank slope

Show simple item record

dc.contributor.author Muralha, J. pt_BR
dc.contributor.author Batista, A. L. pt_BR
dc.contributor.author Lamas, L. pt_BR
dc.contributor.author Mata, J. pt_BR
dc.contributor.author Serra, C. pt_BR
dc.contributor.editor Carlos Pina, Eliane Portela, Laura Caldeira pt_BR
dc.date.accessioned 2025-06-05T15:05:42Z pt_BR
dc.date.accessioned 2025-07-21T13:13:14Z
dc.date.available 2025-06-05T15:05:42Z pt_BR
dc.date.available 2025-07-21T13:13:14Z
dc.date.issued 2025-04 pt_BR
dc.identifier.uri http://repositorio.lnec.pt:8080/jspui/handle/123456789/1018633
dc.description.abstract During the excavations for the Alto Tâmega dam, a rockslide occurred on the right bank slope immediately downstream from the dam insertion surface, involving a volume of about 23,000 m3, which led to the complete stop of the works. To resume construction, design adaptations had to be introduced to stabilize the downstream slope and ensure adequate safety conditions during dam construction, first filling and operation. The main measures adopted were the following: i) construction of a concrete structure anchored to the rock mass, to replace the volume of rock mass that was affected by the landslide; ii) adjustment of the insertion surface by deepening and widening the excavation of several dam blocks; iii) extension of a gallery in the foundation to monitor two faults and to increase the drainage of the rock mass; and iv) relocating, symmetrically, the dam’s bottom discharge from the right side of the river bed to its left side. Additionally, a series of procedures related to the monitoring plan aimed at guaranteeing adequate safety conditions for the work execution and, mainly, to ensure that the project adaptations yielded the intended effects were implemented. This paper presents a brief description of the events preceding the slope failure, a description of the countermeasures that were implemented to ensure dam safety and some results of the monitoring of the right bank during dam construction and the first filling of the reservoir. pt_BR
dc.language.iso eng pt_BR
dc.publisher LNEC pt_BR
dc.rights restrictedAccess pt_BR
dc.subject Alto Tâmega dam pt_BR
dc.subject Concrete dam construction pt_BR
dc.subject Rockslide pt_BR
dc.subject Design adaptation pt_BR
dc.subject Structural safety control pt_BR
dc.title LNEC support to the design adaptation of Alto Tâmega dam due to the rockslide on the right bank slope pt_BR
dc.type workingPaper pt_BR
dc.identifier.localedicao Lisboa pt_BR
dc.description.pages 9p. pt_BR
dc.identifier.local Lisboa pt_BR
dc.description.sector DBB/NMMR pt_BR
dc.identifier.conftitle Fifth International DAM WORLD Conference pt_BR
dc.contributor.peer-reviewed SIM pt_BR
dc.contributor.academicresearchers NAO pt_BR
dc.contributor.arquivo NAO pt_BR


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account