DSpace Repository

Designing a pre-load embankment for the construction of a stage over a sanitary landfill founded in soft soils

Show simple item record

dc.contributor.author Brito, A. pt_BR
dc.contributor.author Carreto, J. pt_BR
dc.contributor.editor Nuno Guerra pt_BR
dc.contributor.editor Manuel Matos Fernandes pt_BR
dc.contributor.editor Cristiana Ferreira pt_BR
dc.contributor.editor António Gomes Correia pt_BR
dc.contributor.editor Alexandre Pinto pt_BR
dc.contributor.editor Pedro Sêco e Pinto pt_BR
dc.date.accessioned 2024-09-16T15:03:34Z pt_BR
dc.date.accessioned 2024-10-07T15:28:25Z
dc.date.available 2024-09-16T15:03:34Z pt_BR
dc.date.available 2024-10-07T15:28:25Z
dc.date.issued 2024-08 pt_BR
dc.identifier.citation 10.1201/9781003431749 pt_BR
dc.identifier.uri http://repositorio.lnec.pt:8080/jspui/handle/123456789/1017580
dc.description.abstract For World Youth Day event in 2023 (JMJ), the organizing committee selected an area in Parque das Nações that met the imposed requirements, notably in terms of area (for 1 million spectators) and proximity to the Lisbon center. This area, on the other hand, has the distinction of being a sanitary landfill, which was sealed in 1997 as part of the EXPO98 interventions, and which previously, in 1995, experienced a large-scale landslide in the direction of the river, with a front of 300 m of extension, enveloping the foundation up to significant depths. The fundamental cause of the landslide, according to studies undertaken at the time, was the low undrained strength of the foundation's soft soils that were still in the subconsolidation phase, particularly at the deepest levels. Considering this scenario, LNEC performed limit equilibrium stability analyses as well as three-dimensional stress and strain finite-element analyses to estimate the magnitude and evolution of the settlements of the JMJ stage to be built in the southern area. The analyses carried out, the results of which are presented in the article, revealed the need of a pre-load embankment and were used to define criteria for the constructive phasing of the work, which was inherently dynamic and based on the outcomes of the monitoring system installed on site. Finally, values obtained from the monitoring system installed during the construction phase are compared to the values estimated during the design phase. pt_BR
dc.language.iso eng pt_BR
dc.publisher CRC Press pt_BR
dc.rights restrictedAccess pt_BR
dc.subject Sanitary landfill pt_BR
dc.subject pre-load embankment pt_BR
dc.subject soft soils pt_BR
dc.subject slope stability pt_BR
dc.subject consolidation pt_BR
dc.title Designing a pre-load embankment for the construction of a stage over a sanitary landfill founded in soft soils pt_BR
dc.type workingPaper pt_BR
dc.identifier.localedicao Lisbon pt_BR
dc.description.pages 6p. pt_BR
dc.description.comments The authors are grateful to Lisboa Ocidental SRU - Sociedade de Reabilitação Urbana E.M., S.A. for granting permission to disseminate the study's findings. pt_BR
dc.identifier.local Lisbon pt_BR
dc.description.sector DG/NGUT pt_BR
dc.description.magazine Geotechnical Engineering Challenges to Meet Current and Emerging Needs of Society pt_BR
dc.identifier.conftitle XVIII European Conference on Soil Mechanics and Geotechnical Engineering pt_BR
dc.contributor.peer-reviewed SIM pt_BR
dc.contributor.academicresearchers NAO pt_BR
dc.contributor.arquivo NAO pt_BR


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account