Abstract:
Crestuma-Lever dam, completed in 1985, is located in Douro River. A large design flood of 26,000 m3/s involves 8 gated spillway bays with stilling basins directly founded on the alluvial river bed. Regular river bed surveillance downstream of the spillway evidenced unexpected progressive erosion of riprap.