DSpace Repository

SEISMIC MONITORING SYSTEMS IMPLEMENTED ON RECENT PROJECTS

Show simple item record

dc.contributor.author Monteiro, G. pt_BR
dc.contributor.author Pinho, P. pt_BR
dc.contributor.author Gomes, J. P. pt_BR
dc.date.accessioned 2022-02-11T17:27:34Z pt_BR
dc.date.accessioned 2022-03-09T16:05:10Z
dc.date.available 2022-02-11T17:27:34Z pt_BR
dc.date.available 2022-03-09T16:05:10Z
dc.date.issued 2020-09 pt_BR
dc.identifier.uri https://repositorio.lnec.pt/jspui/handle/123456789/1014501
dc.description.abstract In the last decade Portugal made a significant set of investments in new hydroelectric projects under the National Dams Program with High Hydroelectric Potential. EDP Produção SA, a company of EDP - Energias de Portugal Group, played a fundamental role in the construction of these projects, in which new dams and reservoirs of significant dimensions are integrated. According to Portuguese legislation, with relevance to the RSB-Dam Safety Regulation (Decree-Law no. 21/2018 of 28 March), the DTA-Technical Documents to Support the RSB and taking into account the seismic risk associated with the region where the dams were built, it was recommending the implementation of a set of Seismic Monitoring Systems (SMS) to characterize the seismic actions and the respective structural response, as well as the assessment of the reservoirs induced seismicity. For that, it was necessary, in the design phases, to carry out several studies to define the type of dynamic monitoring systems, especially those related to the seismic monitoring systems (SMS). In their most extensive configuration, these systems, based on triaxial accelerometers sensors, may incorporate remote stations installed along the reservoirs for studying the propagation of seismic actions. For the higher dams, and to ensure a good characterization of the dynamic behaviour, continuous dynamic monitoring system (CDMS) was also installed. This paper presents the main aspects of the legislation, refers the main studies and methodologies that were used, and the general aspects of the regional geological and tectonic framework. Also, is presented several seismic monitoring systems that were implemented by EDP, namely those related to the hydroelectric projects of Baixo Sabor, Foz Tua, Ribeiradio and Alto Ceira II dams. pt_BR
dc.language.iso eng pt_BR
dc.publisher LNEC pt_BR
dc.rights restrictedAccess pt_BR
dc.subject Dams pt_BR
dc.subject Safety pt_BR
dc.subject Portuguese Legislation pt_BR
dc.subject Seismic Monitoring Systems pt_BR
dc.subject Seismic Studies pt_BR
dc.title SEISMIC MONITORING SYSTEMS IMPLEMENTED ON RECENT PROJECTS pt_BR
dc.type workingPaper pt_BR
dc.identifier.localedicao Lisboa pt_BR
dc.description.pages Fourth International Dam World Conference pt_BR
dc.description.sector DBB/NMMR pt_BR
dc.contributor.peer-reviewed SIM pt_BR
dc.contributor.academicresearchers SIM pt_BR
dc.contributor.arquivo NAO pt_BR


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account