DSpace Repository

Seismic monitoring system of Baixo Sabor hydroelectric power scheme

Show simple item record

dc.contributor.author Monteiro, G. pt_BR
dc.contributor.author Neves, J. pt_BR
dc.contributor.author Gomes, J. P. pt_BR
dc.date.accessioned 2019-11-04T11:16:07Z pt_BR
dc.date.accessioned 2019-12-05T10:25:52Z
dc.date.available 2019-11-04T11:16:07Z pt_BR
dc.date.available 2019-12-05T10:25:52Z
dc.date.issued 2019-05 pt_BR
dc.identifier.isbn 978-972-49-2308-6 pt_BR
dc.identifier.uri https://repositorio.lnec.pt/jspui/handle/123456789/1012030
dc.description.abstract The Baixo Sabor hydroelectric scheme is located at northeast of Portugal and creates a reservoir with a storage capacity of 630 million m3 of water. The dam is a concrete double-curvature arch dam with 123 m high. According to the Portuguese legislation and considering the seismic risk of the dam construction zone, a Seismic Monitoring System (SMS) need be provided. In their most extensive configuration, these systems may incorporate remote stations along the reservoir for studying the propagation of seismic waves and to detect eventual induced reservoir seismicity. So, for the observation of the seismic activity on the surrounding area of the reservoir, to characterize the seismic action and the corresponding structural response of the dams, an observation system based on triaxial accelerometers was designed and installed. This system has been in continuous operation since its installation, and the data of the recorded earthquake records has been analyzed and processed. This article presents a brief description of the regional geological and tectonic setting including the stratigraphic and lithological unit’s description, the main geological faults, tectonic history resume, and the local geological surface characterization of the seismic exterior stations. Also, the paper describes the main features of the seismic monitoring system that was installed in the Hydropower Scheme of Baixo Sabor, constructed and owned by EDP Produção a company of EDP - Energias de Portugal Group, and presents some of the main results obtained during the first period of operation of the dam. pt_BR
dc.language.iso eng pt_BR
dc.publisher 3rd Meeting of EWG Dams and Earthquakes pt_BR
dc.rights restrictedAccess pt_BR
dc.subject Dams pt_BR
dc.subject Concrete pt_BR
dc.subject Seismic hazard pt_BR
dc.subject Safety pt_BR
dc.subject Dynamic monitoring pt_BR
dc.title Seismic monitoring system of Baixo Sabor hydroelectric power scheme pt_BR
dc.type workingPaper pt_BR
dc.identifier.localedicao Lisboa pt_BR
dc.identifier.local Lisboa pt_BR
dc.description.sector DBB/NMMR pt_BR
dc.identifier.conftitle 3rd Meeting of EWG Dams and Earthquakes pt_BR
dc.contributor.peer-reviewed SIM pt_BR
dc.contributor.academicresearchers NAO pt_BR
dc.contributor.arquivo SIM pt_BR


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account