Abstract:
The present report describes the construction of a model in limestone masonry for the user Group 3 oh the ECOLEADER Project, led by IRIDEX Construction Group, and the first phase of the experimental program developed in LNEC. The description of the construction, a photographic report and the results obtained on the characteristics tests made on the mortars used in the construction are presented.
The construction was carried out by contractor José dos Santos Paixão on the basics of model details and materials specifications proposed by the User group 3, being NESDE/LNEC responsible for the guidance and supervision of the works.