DSpace Repository

Daivões dam spillway: a novel solution for the stilling basin

Show simple item record

dc.contributor.author Alves, E. pt_BR
dc.contributor.author Hernando, F. pt_BR
dc.contributor.author Chacon, R. pt_BR
dc.date.accessioned 2015-05-07T09:31:51Z pt_BR
dc.date.accessioned 2017-04-12T16:10:50Z
dc.date.available 2015-05-07T09:31:51Z pt_BR
dc.date.available 2017-04-12T16:10:50Z
dc.date.issued 2015-04 pt_BR
dc.identifier.uri https://repositorio.lnec.pt/jspui/handle/123456789/1007158
dc.description.abstract The Upper Tâmega Hydroelectric Project is located in the Tâmega River, a tributary of Douro River, and includes, among other elements, the construction of three dams: Alto Tâmega, Daivões and Gouvães. Daivões Dam is a concrete arch gravity structure, 77 m high above foundation, with a gated controlled spillway, located in the center of the dam, and followed by stilling basin controlled by a tall end weir to force the hydraulic jump in a shorter distance. The hydraulic performance of the proposed spillway stilling basin was tested and optimized on a physical model at 1:50 scale. The paper presents the results of the physical models study and the final unconventional solution adopted for the spillway stilling basin. pt_BR
dc.language.iso eng pt_BR
dc.rights openAccess pt_BR
dc.subject Spillway pt_BR
dc.subject Stilling basin pt_BR
dc.subject Dentate weir pt_BR
dc.subject Physical model pt_BR
dc.title Daivões dam spillway: a novel solution for the stilling basin pt_BR
dc.type conferenceObject pt_BR
dc.description.pages 01-10pp pt_BR
dc.identifier.local LNEC, Lisboa pt_BR
dc.description.sector DHA/NRE pt_BR
dc.identifier.conftitle Second International DAM WORLD Conference pt_BR


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account