DSpace Repository

Development of an integrated system for early warning of recreational waters contamination

Show simple item record

dc.contributor.author David, L. M. pt_BR
dc.contributor.author Oliveira, A. pt_BR
dc.contributor.author Rodrigues, M. pt_BR
dc.contributor.author Jesus, G. pt_BR
dc.contributor.author Póvoa, P. pt_BR
dc.contributor.author David, C. pt_BR
dc.contributor.author Costa, R. pt_BR
dc.contributor.author Fortunato, A. B. pt_BR
dc.contributor.author Menaia, J. pt_BR
dc.contributor.author Frazão, A. pt_BR
dc.contributor.author Matos, R. S. pt_BR
dc.date.accessioned 2014-08-22T16:07:04Z pt_BR
dc.date.accessioned 2014-10-20T12:58:28Z pt_BR
dc.date.accessioned 2017-04-13T11:23:47Z
dc.date.available 2014-08-22T16:07:04Z pt_BR
dc.date.available 2014-10-20T12:58:28Z pt_BR
dc.date.available 2017-04-13T11:23:47Z
dc.date.issued 2013-06 pt_BR
dc.identifier.uri https://repositorio.lnec.pt/jspui/handle/123456789/1006382
dc.description.abstract An early warning system for pollution events of recreational waters is being developed, within the scope of FP7 “PREPARED – Enabling Change” project and the Portuguese SIMAI and SI-GeA projects. The system is being applied to the Tagus estuary, accounting for the impact of the outfall from Alcântara combined catchment, the largest catchment of Lisbon. This system explicitly integrates the monitoring and modelling of the different physical and contamination processes from the catchment to the receiving water, at the appropriate spatial and temporal scales. The work includes the development of the following key activities: 1. Selection of the pilot area and gathering of data; 2. Mathematical modelling (sewer system and estuary); 3. Experimental surveys; 4. On-line monitoring of hydraulic and water quality parameters (sewers and estuary); 5. Integration of the models and monitoring data within a computational platform for real-time control, based on an existing platform for the estuary hydrodynamics forecast (http://ariel.lnec.pt); 6. Development of a prototype early warning system based on the integrated monitoring and modelling system and on the real time forecast platform. The first three activities are almost completed. Water quality on-line monitoring stations are being installed and models integrated within the platform. This paper aims to describe the methodology and the preliminary results for this early warning system. pt_BR
dc.language.iso por pt_BR
dc.publisher GRAIE pt_BR
dc.rights openAccess pt_BR
dc.subject Early warning systems pt_BR
dc.subject Integrated modelling pt_BR
dc.subject On-line monitoring network pt_BR
dc.subject Real time management pt_BR
dc.subject Recreational waters pt_BR
dc.title Development of an integrated system for early warning of recreational waters contamination pt_BR
dc.type conferenceObject pt_BR
dc.description.figures 10 pt_BR
dc.description.tables 0 pt_BR
dc.description.pages 10p pt_BR
dc.identifier.seminario 8th Int. Conf. on Sustainable Techniques and Strategies in Urban Water Management - Novatech 2013 pt_BR
dc.identifier.local Lyon, França pt_BR
dc.description.sector DHA/NES pt_BR
dc.description.year 2013 pt_BR
dc.description.data 23 a 27 de junho pt_BR


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account