DSpace Repository

Recycling of construction and demolition waste in geotechnical works

Show simple item record

dc.contributor.author Fortunato, E. pt_BR
dc.contributor.author Lopes, M. L. pt_BR
dc.contributor.author Curto, P. pt_BR
dc.contributor.author Fonseca, A. pt_BR
dc.date.accessioned 2013-05-07T09:30:52Z pt_BR
dc.date.accessioned 2014-10-21T08:49:16Z pt_BR
dc.date.accessioned 2017-04-13T12:03:08Z
dc.date.available 2013-05-07T09:30:52Z pt_BR
dc.date.available 2014-10-21T08:49:16Z pt_BR
dc.date.available 2017-04-13T12:03:08Z
dc.date.issued 2012-07 pt_BR
dc.identifier.uri https://repositorio.lnec.pt/jspui/handle/123456789/1004714
dc.description.abstract About 50% of the materials extracted from the earth’s crust are used in construction. Given the huge consumption that has been made of minerals and ores in Europe, which amounts to about 15 tons per year for each inhabitant of the European Union, of which about 2/3 are industrial and ornamental rocks, it is necessary to promote urgently significant changes to consumption patterns. The recycling of construction materials is an ancient practice, used by the Egyptians, Greeks and Romans. In the modern era, began to find expression in Europe after the 2nd World War, when crushed rock started to be used in the reconstruction of buildings. The Construction and Demolition Waste (CDW) are wastes derived from construction, reconstruction, extension, alteration, maintenance and demolition and collapse of buildings. They include soil, rocks, vegetation, earthworks and foundations and also materials used in roads maintenance. This paper presents an overview, at the international level, of the type, amount produced and amount recycled of CDW. The importance of the knowledge related with the in situ performance of recycled materials is highlighted, together with the contribution of studies and technical specifications for the acceptance of these materials. A brief presentation of the production and recycle process of construction and demolition waste is made and their application in geotechnical works is addressed. Finally, barriers regarding the application of these materials are identified and some procedures in order to encourage the use of recycled materials are pointed out, such as: implementation of a waste management plan for the planning, design, construction and maintenance of works; strong incentive for selective demolition and separation in situ, in order to obtain good quality waste for recycling, encourage recycling in situ; promote conditions for the installation of recycling areas; promote the use of CDW in public and private works; promote the creation of recycling facilities in appropriate areas with strategic location; promote cooperation between enterprises of the construction sector, stakeholders and RTD institutions, to implement research and, consequently, expand the scope of CDW application. pt_BR
dc.language.iso eng pt_BR
dc.rights openAccess pt_BR
dc.subject Construction and demolition waste pt_BR
dc.subject Recycling pt_BR
dc.subject Geotechnical works pt_BR
dc.subject Portuguese case studies pt_BR
dc.title Recycling of construction and demolition waste in geotechnical works pt_BR
dc.type conferenceObject pt_BR
dc.description.pages 11p pt_BR
dc.identifier.seminario 1st International AFRICA Sustainable Waste Management Conference pt_BR
dc.identifier.local Lobito, Angola pt_BR
dc.description.sector DT/NIF pt_BR
dc.description.year 2012 pt_BR
dc.description.data 23 a 25 de Julho pt_BR


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account