DSpace Repository

Analysis and interpretation of the structural behaviour of Alqueva dam during the first filling of the reservoir

Show simple item record

dc.contributor.author Tavares de Castro, A. pt_BR
dc.contributor.author Batista, A. L. pt_BR
dc.contributor.author Serra, C. pt_BR
dc.contributor.editor C. Pina, E. Portela, J. Gomes pt_BR
dc.date.accessioned 2012-10-18T13:56:07Z pt_BR
dc.date.accessioned 2014-10-09T14:21:45Z pt_BR
dc.date.accessioned 2017-04-13T11:55:49Z
dc.date.available 2012-10-18T13:56:07Z pt_BR
dc.date.available 2014-10-09T14:21:45Z pt_BR
dc.date.available 2017-04-13T11:55:49Z
dc.date.issued 2011-02 pt_BR
dc.identifier.uri https://repositorio.lnec.pt/jspui/handle/123456789/1003935
dc.description.abstract This paper presents the most relevant monitoring data and the interpretation of the structural behaviour of Alqueva dam during the first filling of the reservoir, which took place between February 2002 and January 2010. The safety control and the interpretation of the dam’s behaviour make use of the data provided by the monitoring system. In particular, the interpretation of the structural behaviour is based on: planimetric (radial and tangential) displacements, measured through plumb-line and geodetic methods; vertical displacements, measured with rod extensometers and obtained through geometric levellings; and temperatures, strains and stresses within the dam’s body, measured with embedded electrical resistance devices. A three-dimensional finite element model, considering the concrete viscoelastic behaviour and foundation specific characteristics, such as fault 22 located in the left bank, was developed for the numerical simulation of the dam structural behaviour. The time histories of the hydrostatic load and of the measured temperature within the dam’s body were considered in the model. The dam’s full-mixed concrete delayed behaviour was assumed to be represented by the Bažant and Panula’s basic creep function, evaluated from both in situ and laboratory tests. The results of a quantitative interpretation of the monitored displacements during this period, using a viscoelastic formulation, are close to those provided by the structural analysis. pt_BR
dc.language.iso eng pt_BR
dc.publisher 6th International Conference on Dam Engineering pt_BR
dc.rights openAccess pt_BR
dc.subject Alqueva dam pt_BR
dc.subject Concrete creep pt_BR
dc.title Analysis and interpretation of the structural behaviour of Alqueva dam during the first filling of the reservoir pt_BR
dc.type conferenceObject pt_BR
dc.identifier.localedicao Lisboa pt_BR
dc.description.figures 19 pt_BR
dc.description.tables 2 pt_BR
dc.description.pages 20 pt_BR
dc.identifier.seminario 6th International Conference on Dam Engineering pt_BR
dc.identifier.local Lisboa pt_BR
dc.description.sector DBB/NO pt_BR
dc.description.year 2011 pt_BR
dc.description.data 15-17 Fevereiro pt_BR


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account